Sub-Project 7: Oak/Oconee Bridge Underpass

Project Details

Sub-Project #7 is to provide an at grade connection between the greenway trail sections on either side of the Oak/Oconee Street bridge. The project is being planned to be built at the same time as the GDOT bridge over Oak/Oconee Street is being replaced.   

Project Updates

The design on the GDOT portion of the project is moving along.  ACCGOV is contracting with the firm Gresham Smith to perform the design and permitting portions of the greenway trail under the bridge at the same time as they are doing the work for GDOT.

Was this page helpful for you? Yes No