Road & Lane Closures

Closure Notes
Red text indicates new closures or revisions made to existing closures this week.  All road and lane closures are scheduled pending weather conditions. View the Lane Closure Form to request a lane closure.  Email Engineering@athensclarkecounty.com for more information. 
   

 Road Closures




Hull Street from Broad Street - Clayton Street March 2 - 6, 2015 Stock Drywall Intile Paint & Drywall

No Parking







 Sidewalk



Barber Street from Prince Avenue - Boulevard Avenue February 16 - March 20, 2015 Reconstruct Sidewalk ACC Streets & Drainage
 Clayton Street from College Avenue - Jackson Street  February 28, 2015  Crane Work  Toby Hines Crane
 2555 Lexington Road from Hughes Street - County Farm Road  February 25 - March 25, 2015  Reconstructing Entrance Way and Sidewalk  ACC Streets & Drainage

Lane Closures



 Coile Drive from Mitchell Bridge Road - 800 Feet Down Coile Road (Intermittent Lanes)  November 17 - March 31, 2015  Install Storm Drain Pipe  Strickland & Sons Pipeline
 E. Washington Street from N. Thomas Street - Lumpkin Street February 16 - March 6, 2015  Replace GPC MH Rings and Lids  Georgia Power Network 
 Mitchell Bridge Road from Coile Drive - Preserve Drive  February 2 - March 31, 2015  Road Construction  Strickland & Sons Pipeline
 N. Thomas Street from E. Washington Street - W. Clayton Street February 23 - March 6, 2015  Replace GPC MH Rings and Lids  Georgia Power Network 
 Norwood Circle from Danielsville Road - Danielsville Road  February 18 - March 20, 2015  Installing Water Main  Arrowhead General Contracting
 Norwood Circle from Danielsville Road - Norwood Circle  February 11 - March 20, 2015  Installing Water Main  Arrowhead General Contracting
 Tallassee Road from 600 feet West of Whitehead Road - 600 East of Whitehead Road  October 27 - March 31, 2015  Road Construction  Strickland & Sons Pipeline

Lane Restrictions



 Barber Street from Prince Avenue - Boulevard Street  February 16 - March 20, 2015  Reconstruct Sidewalk  ACC Streets & Drainage
 Coile Drive from Mitchell Bridge Road - 800 Feet Down Coile Road (Intermittent)  November 17 -
March 31, 2015
 Install Storm Drain Pipe  Strickland & Sons Pipeline
 E. Washington Street from N. Thomas Street - N. Lumpkin Street February 23 - March 6, 2015 Replace GPC MH Rings and Lids Georgia Power Network
 2555 Lexington Road from Hughes Street - County Farm Road  February 25 - March 25, 2015  Reconstructing Entrance Way and Sidewalk  ACC Streets & Drainage
 Mitchell Bridge Road from Coile Drive - Preserve Drive (Intermittent Lanes)  December 15 - March 31, 2015  Road Construction  Strickland & Sons Pipeline
 N. Thomas Street from E. Washington Street - W. Clayton Street  February 23 - March 6, 2015  Replace GPC MH Rings and Lids  Georgia Power Network
 Tallassee Road from 600 feet West of Whitehead Road - 600 East of Whitehead Road (Intermittent Lanes)  October 27 - March 31, 2015  Road Construction  Strickland & Sons Pipeline
Virginia Lane from Hancock Avenue - 
Spring Valley Road
 February 18 - March 20, 2015 Water Line Arrowhead General Construction
 Special Events
 Barrow Boogie 5K
(E. Rutherford Street, Stanton Way, W. Cloverhurst Avenue, Mount Vernon Place, Springdale Street, Fortson Drive, Meadowbrook Road, Meadowview Road, Bobbin Mill Road, W. Cloverhurst Avenue, Mount Vernon Place, W. Rutherford Street)
 February 28, 2015  Fundraiser for Barrow Elementary  Barrow Elementary School